Projects - Office R&D Class A Office Space

Network Appliance Building 8

This new 5 story corporate class A office building connects to Network Appliances corporate headquarters. This design build project is being constructed with a state of the art chilled water plant serving custom air handling units. The building houses Network Appliance’s employee work out facilities; including a complete gymnasium that is also used for all hands meetings and corporate presentations. This project is being built using LEED techniques.

General Project Data

  • 190,000 square feet of office space.
  • Water cooled chilled water plant using variable flow primary technology.
  • Custom chilled water air handling units.
  • VAV with hot water reheat
  • Chilled water fan coils for 24/7 spaces
  • Automated logic DDC Controls
  • Start Date 12/1/07
  • Completion Date 8/1/08


Apple Computers

Since early 2007 United Mechanical and Apple have improved nearly 300,000 square feet of office and R&D space. These spaces have ranged from dedicated labs with 24/7 computer room air handling units to ultra modern and high-end exposed spaces meant to attract and retain the new generation of employee. As an industry leader in their field Apple is among a group of companies that have the environment in mind and has voluntarily registered their two most recent projects with the USGBC to attain a LEED Gold rating. As one of Apples approved vendors United Mechanical is committed to providing HVAC&R systems that have our engineering staff thinking outside of the box in our design while maintaining an efficient and functional system.



BEA Headquarters

This 18 Story structure was built in 2000 but stood empty until BEA purchased it in 2007. The building consists of 12 floors of class A office build out. The first 5 floors consist of the infrastructure necessary to support their business. This infrastructure includes an auditorium for all hands meeting and customer presentations; an executive briefing center; a full service and kitchen and cafeteria; training center; and corporate Data Center. This design build project was performed using LEED techniques.

General Project Data

  • 381,000 square feet of office space
  • VAV with hot water reheat
  • Condenser water with water source heat pumps for 24/7 spaces
  • Automated logic DDC Controls
  • Start Date 12/15/07
  • Completion Date 7/25/08

Additional Office R&D Projects

  • Juniper Networks – Sunnyvale, Ca – Design/Build
  • Micron – San Jose, Ca – Plan & Spec
  • Safeway Corporate – Pleasanton, Ca – Plan & Spec
  • ACM Coleman - San Jose, Ca – Design/Build
  • 49ers Training Facility – Santa Clara, Ca – Design/Build
  • SAP Campus Expansion – Palo Alto, Ca – Design/Build
  • Comcast Technical Operations Center – Fairfield, Ca – Design/Build
  • Google – Mountain View, Ca – Design/Build